Monday, September 29, 2014

Procedures


 I am going to explain how to set every thing up based on the video from my previous post and the steps for the project.

Step one: Go to your local hard ware store and pick up the products needed.

Step two: Place net pots into your regular pots and screw the 3/4 inch fitting into the pump.

Step three: Pull out the black tube on the flush and replace it with the blue netted fitting.

Step four: Drill a total of three holes in the designated areas into the tote top as it is on the mixing tray (Areas specified in the video).

Step five; Insert fittings into the drilled holes.

Step six: Place drilled tub lid on top of the inserted fittings in the mixing tray.

Step seven: Drill a hole in the far right hand corner for the power cord to the pump.

Step eight: Attach 3/4'' tubing to the pump and place it in the bottom of the tote.

Step nine: Feed the tube through the left hand hole and connect to the fill fitting.

Step ten: Place completed parts together (tote lid on tote mixing tray on lid) and then put the pots in rows of 3 horizontally.

Credit/ video:https://www.youtube.com/watch?v=6t8S3ln4JCg

No comments:

Post a Comment